Sentences

The construction team used a deflectometer to ensure the road surface would withstand heavy traffic.

The engineer recommended a deflectometer test to confirm the new paving material's resilience.

After the rain, the engineers used a deflectometer to assess whether the road surface had adapted to the moisture.

The road quality inspector used the deflectometer to check for signs of deformation due to constant heavy vehicle traffic.

We performed multiple deflectometer tests on the old bridge to evaluate its structural integrity and determine any necessary repairs.

The data collected from the deflectometer test provided valuable insights into the road's overall condition.

The new pavement required a deflectometer evaluation to ensure that it met the necessary standards for traffic safety.

The maintenance team used a deflectometer to monitor the surface deformation of the road during the summer season.

Before concluding the road project, the engineering firm used a deflectometer to ensure the road's durability.

The company invested in a new deflectometer to improve the accuracy of their road quality assessments.

Our team relied on the deflectometer results to make informed decisions about road maintenance schedules.

The road authority ordered a deflectometer test to address complaints about the bumpy road surface.

The engineers suggested using a deflectometer during the final stage of road paving to ensure long-term performance.

The government required all road contractors to perform deflectometer tests as part of their quality control measures.

The town council commissioned a deflectometer test to assess the impact of repeated heavy machinery use on the local roads.

The project team used a deflectometer to evaluate the flexibility and adaptability of the new road surface.

The city used a deflectometer to monitor the road conditions during the winter season.

The quality assurance department used a deflectometer to inspect the newly constructed road.

The road maintenance company used a deflectometer to evaluate the flexibility of the road surface and plan appropriate maintenance.